Our clay liner materials have been used on landfill and environmental projects throughout the state of Florida. Our natural soil products are mined from sources without the need for dewatering and can serve all project types and sizes without downtime or delay.
We are an FDOT Mine (#14-38) for embankment and MSE backfill.

General Fill (A-2-4)
Spec: Clayey sand mixture with less than 35% passing 200 sieve. Liquid Limit under 40 & Plasticity Index under 10.

A-3 Embankment
Spec: Fine sand with less than 10% passing 200 sieve. Non plastic. Approved by FDOT as embankment.

A-3 Select
Spec: Fine sand with less than 10% passing 200 sieve. Non plastic. Approved by FDOT as MSE backfill.
Clay Stabilizer
Spec: Clayey sand mixture with LBR’s over 40. Non-gumbo.

Pond/Landfill Liner Clay
Spec: Heavy clays, non-gumbo, ideal for applications that require installed permeability that are less than 1×10-7 cm/sec. Minimum of 36% passing 200 sieve.

Topsoil
Spec:Topsoil from our mine is stripped and stockpiled on-site and may be used in applications that require organic material.